Any gaps between the land/water interface will be filled with submerged riprap per request from Texas Parks and Wildlife (TPWD). ![]() ![]() The proposed construction activities include the installation of steel sheet pilings/walers in open water with concrete riprap for toe protections. REVISED PROJECT DESCRIPTION: The applicant proposes to amend a previously authorized project to construct two 150-foot breakwaters along the western entrance of the project site and two 50- to 75-foot breakwaters along the eastern entrance to the project site.
4 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |